Content
 BigPicture

About BigPicture

BigPicture installation and updates

Quick start with BigPicture

BigPicture Sizing Guide

Cloud vs. Server - Key Differences in BigPicture on These Platforms

BigPicture Export

Progress Tracking

Tutorials and tips

Integrations

 BigPicture release notes

BigPicture Cloud Backlog

 BigGantt

About BigGantt

BigGantt - Important Notice

BigGantt installation and updates

BigGantt Cloud Backlog

Cloud vs. Server - Key Differences in BigPicture on These Platforms

 BigGantt release notes

Shortcuts
 Release notes
 BigPicture
 Jira Cloud

 Jira Server

 Trello

 BigGantt
 Jira Cloud

 Jira Server

 BigTemplate
 Jira Cloud

 Jira Server

 BigPicture Enterprise
 Jira Cloud

 Jira Server

Knowledge Base

Tutorials and tips

Search

Task Modes

Different Task Modes allow users to switch tasks' recalculation methods once dragged and dropped in different positions on the chart.

There are 3 different task modes which can be set for all Tasks globally (per Program) and individually (per Card):


TASK MODE

FUNCTIONALITY

AUTO

This mode is always set by the default. When enabled, all related (linked) tasks will be impacted depending on the link type used.

MANUAL

When enabled all related (linked) tasks will not have an impact on dates.

LOCK

Once locked, tasks cannot be moved on the chart.

This feature can be either selected from the 'Data' Tab on the BigGantt or BigPicture Menu Panel (Header) for the global Program setting, as well as from the 'Context' (Ellipsis) Menu located to the right of each Task on the Gantt's WBS for an individual Parent Task, a Child Task or the whole Group. It can be used in a variety of situations.

'Lock' on a Task, for example, can be used as a 'Read-only' setup on a file. It can prevent other users from moving an important Task around on the Gantt chart or editing it with drag and drop actions.

'Manual' setting, on the other hand, makes link dependency between tasks not to take power over a Task in this mode which can help us to see how far on the Gantt chart can we move that Task without affecting the dependency logic between Sibling and Parent tasks. 






  • No labels