Categories

About BigPicture

BigPicture installation and updates

Quick start with BigPicture

BigPicture Sizing Guide

Cloud vs. Server - Key Differences in BigPicture on These Platforms

BigPicture Export

Progress Tracking

Tutorials and tips

Integrations

Concept of a Program

Setting up BigGantt and BigPicture to support next-gen projects


BigPicture Cloud Backlog

About BigGantt

BigGantt installation and updates

Cloud vs. Server - Key Differences in BigPicture on These Platforms

Shortcuts

Knowledge Base

Tutorials and tips

Trust Center

BigPicture 8 is here!

Discover the landmark edition of the Atlassian Marketplace top-selling app! The new version is available to all Cloud, Server and Data Center users. Visit BigPicture 8 Documentation to learn more about it.


Data migration to the NEW Board module

IMPORTANT NOTICE

Updating BigPicture to version 7.11 and above will migrate your Board data to the new Board module.

All your data from the legacy Board module will be automatically migrated to the new Board, so that you can continue your work with a minmal loss of data.

Data to be migrated

The following data will be migrated:

  • Iterations and their periods
  • Iteration scope sync settings (both for Small team and Large team sync modes)
  • Scope of iterations
  • Team assignment (Team assigned will not change as it is stored as a separate field)
  • Task period sync settings ("Task period alignment" mode for "Iteration" time boxes only)

Migration rules

Due to changes introduced with Board New some of the settings were renamed but the ideas behind them remained the same. See the table below for more details:

Legacy boardNew Board module
Small team sync modeShared sync mode
Large team sync mode Team specific sync mode

Iteration scope sync: if on a Jira instance, a Jira sprint was synced with multiple Iterations within all existing Programs, the app will migrate scope sync settings only for the synced Iterations ("no sync" mode will be set for all remaining Iterations). 

Cadence planning settings will not be migrated (in new Board module, team and individual capacities are calculated automatically based on resource Workload and Holiday Plans).




  • No labels