Content
 BigPicture

About BigPicture

BigPicture installation and updates

Quick start with BigPicture

BigPicture Sizing Guide

Cloud vs. Server - Key Differences in BigPicture on These Platforms

BigPicture Export

Progress Tracking

Tutorials and tips

Integrations

 BigPicture release notes

BigPicture Cloud Backlog

 BigGantt

About BigGantt

BigGantt - Important Notice

BigGantt installation and updates

BigGantt Cloud Backlog

Cloud vs. Server - Key Differences in BigPicture on These Platforms

 BigGantt release notes

Shortcuts
 Release notes
 BigPicture
 Jira Cloud

 Jira Server

 Trello

 BigGantt
 Jira Cloud

 Jira Server

 BigTemplate
 Jira Cloud

 Jira Server

 BigPicture Enterprise
 Jira Cloud

 Jira Server

Knowledge Base

Tutorials and tips

Search

Known issues

T Key Summary P
Loading...
Refresh

Key new features

ModuleFeatureDescriptionDoc articleSneak peek
GanttMapping 'Time spent + Remaining Estimate' to End date

From now on, End Date is calculated based on Time Spent + Remaining Estimate.  As result, Task duration edit actions (resize) can not change Time Spent value (task can not be shorter than TS value). Resize action can change only the Remaining Estimate value. RE = 0 when task duration = TS. 

--

GanttFull synchroniztion of all active programs after plugin installation / enablingAfter BigGantt app is upgraded/ enabled, the app runs a full scope synchronization process right away for all existing active (not closed) Programs. As a result, there is an increased probability that all active Programs will be synchronized once a user wants to open a given Program and start working with it.--

Bug fixes

Issue Type Priority
BlockerBlocker CriticalCritical MajorMajor MinorMinor NoneNone T:
BugBug 1 1 16 5 0 23
StoryStory 0 2 1 1 1 5
TechnicalTechnical 1 2 1 0 0 4
Total Unique Issues: 2 5 18 6 1 32
Showing 3 of 3 statistics.
View in Jira

Feature list


Use "Incognito mode" to open below tickets and find out the details.


T Key Summary P epic link
Loading...
Refresh


Bug fix list

Use "Incognito mode" to open below tickets and find out the details.


T Key Summary P
Loading...
Refresh

  • No labels