Content
 BigPicture

About BigPicture

BigPicture installation

Quick start with BigPicture

Roadmap module

 Scope module (BP 7)

Export in BigPicture

Tutorials and tips

Integrations

 BigPicture release notes

BigPicture Cloud Backlog

Shortcuts
 Release notes
 BigPicture
 Jira Cloud

 Jira Server

 Trello

 BigGantt
 Jira Cloud

 Jira Server

 BigTemplate
 Jira Cloud

 Jira Server

Knowledge Base

Tutorials and tips

Search

Key new features

  • Skill Widget on issue details view
    You are now allowed to add required skills to complete issue and therefore estimate skill demand in your project. Find out more here.



  • Skill Panel on Resources module
    You are now allowed to analyze skills capacity and allocation in Resources module and, as a result, balance skills demand and supply more efficiently. Find out more here.



  • Remaining capacity row on Resources module
    BigPicture will do the maths for you and tell you how much your resources are over-allocated or how much space they still have. Find out more here: 



  • Perspectives to Gantt Column Views migration
    Configure you Column View visible on Gantt module: search and filter out desired fields and configure a given View by dragging and dropping fields from the right to the left side

  • Column view configuration on WBS panel (issue details page)

Details



Issue Type Priority
BlockerBlocker CriticalCritical MajorMajor MinorMinor TrivialTrivial T:
BugBug 1 2 37 4 1 45
FeatureFeature 0 1 1 0 0 2
StoryStory 1 0 15 1 0 17
Total Unique Issues: 2 3 53 5 1 64
Showing 3 of 3 statistics.
View in Jira

P T Key Summary Resolution Status
Loading...
Refresh





  • No labels