Content
 BigPicture

About BigPicture

BigPicture installation and updates

Quick start with BigPicture

BigPicture Sizing Guide

Cloud vs. Server - Key Differences in BigPicture on These Platforms

BigPicture Export

Tutorials and tips

Integrations

 BigPicture release notes

BigPicture Cloud Backlog

 BigGantt

About BigGantt

BigGantt - Important Notice

BigGantt installation and updates

BigGantt Cloud Backlog

Cloud vs. Server - Key Differences in BigPicture on These Platforms

 BigGantt release notes

Shortcuts
 Release notes
 BigPicture
 Jira Cloud

 Jira Server

 Trello

 BigGantt
 Jira Cloud

 Jira Server

 BigTemplate
 Jira Cloud

 Jira Server

 BigPicture Enterprise
 Jira Cloud

 Jira Server

Knowledge Base

Tutorials and tips

Search

Download from Atlassian Marketplace

Known issues

Warning

Please take into consideration known issues which are listed bellow.

  1. ONE-524 - Getting issue details... STATUS  Risk gadget will not be available both on Jira Dashboards and on Confluence pages (in case Jira is integrated with Confluence). 
  2. ONE-80 - Getting issue details... STATUS
  3. ONE-508 - Getting issue details... STATUS

New key features

FeatureDescription
Tasks are automatically scheduled based on assignee's working daysTask start and end dates (task period) and its duration are always (if the feature is on) adjusted to working days of an individual resource assigned to a task, e.g. task will automatically be longer if non-working days are in-between task's time period. Read more here.
Task period is recalculated based on auto bottom-up and auto top-down task modeAuto mode is replaced by two new modes: auto bottom-up and auto top-down. If auto bottom-up mode is on, parent tasks will be adjusted to their children; if auto top-down mode is on, parent task guards the periods of its child tasks. Read more here.
Task mode is synchronized with a chosen field in JiraIt is possible to migrate all task modes from BigPicture/BigGantt to selected field in Jira. Read more here.
Jira Project is set by default based on selected task By creating new Jira issue Project is automatically filled in based on selected task on Gantt. Read more here.

Details

Issue Type Priority
BlockerBlocker CriticalCritical MajorMajor MinorMinor TrivialTrivial NoneNone T:
BugBug 3 10 41 11 1 0 66
FeatureFeature 0 1 3 0 0 0 4
StoryStory 0 4 102 4 0 1 111
TechnicalTechnical 0 0 1 0 0 0 1
Total Unique Issues: 3 15 147 15 1 1 182
Showing 4 of 4 statistics.
View in Jira

T Key Summary P epic link
Loading...
Refresh

T Key Summary P
Loading...
Refresh