 Release notes
 BigPicture
 Jira Cloud

 Jira Server

 Trello

 BigGantt
 Jira Cloud

 Jira Server

 BigTemplate
 Jira Cloud

 Jira Server

Knowledge Base

Tutorials and tips

Search

Download from Atlassian Marketplace

Warning

Back up your database before starting the upgrade process or test the new BigPicture version on an isolated environment.

Known issues

Please take into consideration known issues which are listed bellow.


  1. Risk gadget will not be available both on Jira Dashboards and on Confluence pages (in case Jira is integrated with Confluence).  ONE-524 - Getting issue details... STATUS
  2. ONE-536 - Getting issue details... STATUS
  3. ONE-80 - Getting issue details... STATUS
  4. ONE-508 - Getting issue details... STATUS

Key features

ModuleFeatureDescription



Board

BRAND NEW!



Board 2.0 (MVP version) is available

It is possible to customize Task Card view. Read more here.

It is possible to synchronize the BigPicture Iterations and Program Increments with either Jira sprints or Jira custom field instead of Iterations with Jira sprints only. Read more here.

Tasks can be managed within and planned for both Iterations and Program Increments.

Additionally, aggregated data are visualised on Reports. Read more here.

Links created in new Board module are now independent of the links created on Gantt: there is new soft-links mechanism, e.g. when a user sets a link in Board 2.0 module, "relates to" link is created between the issues in Jira. Read more here.
Text field and number field presented in columns on the backlog and are editable. Read more here.




Gantt

Tasks are automatically scheduled based on assignee's working daysTask start and end dates (task period) and its duration are always (if the feature is on) adjusted to working days of an individual resource assigned to a task, e.g. task will automatically be longer if non-working days are in-between task's time period. Read more here.
Task period is recalculated based on auto bottom-up and auto top-down task mode

Auto mode is replaced by two new modes: auto bottom-up and auto top-down. If auto bottom-up mode is on, parent tasks will be adjusted to their children; if auto top-down mode is on, parent task guards the periods of its child tasks. Read more here.

Please note, that some start and end dates may be recalculated after upgrading to this version.

Read more: PPM-5548 - Getting issue details... STATUS

Task mode is synchronized with a chosen field in JiraIt is possible to migrate all task modes from BigPicture/BigGantt to selected field in Jira. Read more here.
Jira Project is set by default based on selected task By creating new Jira issue Project is automatically filled in based on selected task on Gantt. Read more here.
RoadmapRoadmap reportsIt is possible to visualize the statuses of PI/iteration team objectives and main objectives on bar charts and pie charts.
ScopeNew default Column ViewsThere are default Column Views for Scope module loaded by creating new program: Timetracking, Basic, Team, Releases. Read more here.
Inline editing is possibleText field and number field presented in columns are editable. Read more here.

Resources

Resource absences

In Resource administration, it is now possible to add absences for a particular resource so that his/her capacity (presented e.g. in a Resources module) is affected accordingly. Read more here

User can schedule tasks on a week-number scaleIn Resources Module was added third timeline scale to represent a number of a week. Read more here
RiskInline editing is possibleText field and number field presented on the Risk Cards are editable. Read more here.
BigPicture administration"Migrate values" option for all mapped fields in task configurationIt is now possible to migrate values from all synchronized fields in task configuration instead of Start/End dates only. Read more here.


Details

Issue Type Priority
BlockerBlocker CriticalCritical MajorMajor MinorMinor TrivialTrivial NoneNone T:
BugBug 4 13 100 25 1 0 143
FeatureFeature 0 4 7 0 0 0 11
StoryStory 0 8 230 8 0 2 248
Total Unique Issues: 4 25 337 33 1 2 402
Showing 3 of 3 statistics.